i had a scenario where 4 production lines are used to produce fg material,in final operation all material produced in different lines are mixed . i am using different grades of raw material( single raw material) in different ratio in each line . during adding raw material in the operation batch number is recorded .
in each line 1 ton of material is produced for 1 hour , i had a production order of 100 tons i had to produce 25 batches ( each batch produce 1 ton ) in each line , and each time batch number should be recorded. if raw material from 1st operation enters to 2nd operation in 1st line new batch is again added in 1st operation this process continues un till production order quantity is reached. how to map this scenario in sap.