Quantcast
Channel: SCN : All Content - All Communities
Viewing all articles
Browse latest Browse all 7999

In WM-PP Staging system picking next batch even stock is available in first batch

$
0
0

Dear Experts,

 

I am using WM-PP interfacing with all relevant setting required for material staging through LP10 > Create TR> Create TO in WM with background processing.


Today system while creating TO from TR picked the stock from next batch even when there is sufficient stock available in the first batch which should be picked as per FIFO strategy set in storage type.

 

The incident runs as below-

In Process Order RM 600000164 Qty- 403.000 is required in operation 20

LP10>TR Created

Stock available in IM and WM both-

Batch-A  1160.000 received on 12 Dec 14

Batch-B  4400.000 received on 16 Jan 15

While creating TO from TR in Background system picked

From Batch-A    303.000

          Batch-B    100.000

Here system should have picked all 403.000 qty from batch-A only as all the qty in the batch-A is available stock both in IM and WM.

 

Please suggest the reason for this type of behaviour and how this can be controlled as this is a big deviation.



Thanks in advance

 

- Datta


Viewing all articles
Browse latest Browse all 7999

Trending Articles