Quantcast
Channel: SCN : All Content - All Communities
Viewing all articles
Browse latest Browse all 7999

Two different settings required for an inspection type (HU and Non-HU)

$
0
0

Hello SAP Experts,

I have a situation whereas the user might sometimes want a particular material to be packed (HU managed) or sometimes put in a railcar (bulk - non HU managed). 

 

I am currently using inspection type 04 with Early Lot inspection.  My challenge is that for HU managed receipts, the "Inspection for Handling Unit" flag must be set in order for the Handling Units to go to quality inspection stock.  If I have this flag set and do a normal GR (MB31 or MIGO), then the stock will NOT go to quality inspection.  I thought I might need to create two inspection types and assign them to the same material, but this did not work.

 

I did a search and found 1 posting where the recommendation was to do some development (ABAP).  I can do this, but I was hoping for a standard solution first.  Any ideas?

 

Thanks,
Wally


Viewing all articles
Browse latest Browse all 7999

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>