Dear Experts,
We are implementing positive time management and we have the scenario capturing all intermediate swipe-in/outs also along with first swipe-in as P10 and last swipe-out as P20. So i identified the following indicators for swipe-in/swipe outs events upload in sequence
P10=First Swipe-in
P01=Intermediate Swipe out
P05=Intermediate Swipe in
P20=Last Swipe-out
Now issue is if i maintain the records in same sequence in IT2011 as shown below, time evaluation is not capturing the P20 i.e. last swipe out event and there is a message coming as no clock-in entry. Though as you see all entries are there in IT2011. Its only capturing entries upto P05 entry.
Can anyone please give me clue on the same. All the time events are imp. to capture to compute net working hours of the employee so that overtime or lost hours can be processed in payroll.
Regards
Tandrima